[8]D.S. Yamashita, V.A. Armentano, M.Laguna, Robust optimization models for project scheduling with resource availability cost[J].Journal of Scheduling, 2007, (10), 67–76.
[9]Hazir, ., Haouari, M., Erel, E., “Robust scheduling and robustness measures for the discrete time/cost tade-off problem”[J]. European Journal of Operational Research, Vol. 201, No. 2, 2010, 633-643.
[10]M.Knig, Robust Construction Scheduling Using Discrete-Event Simulation[C].Proceedings of the 2011 ASCE International Workshop on Computing in Civil Engineering.
[12]Davison E.J. The robust control of a sermechanism problem for linear time invariant multivariable systems[J]. IEEE Trans AC, 1976,21(1):25-34.
[12]Zames G. Feedback and optimal sensitivity: model reference transformations, multiplicative semi norms and approximate inverses[J].IEEETrans. Automat. Contr., 1989, AC-26(2):301-321.
[13]Doye J, Glover K, Khargonekar P Petal. State-space Solution to Standard Control Problems Proc[J]. American control conference, Atlanta, GA. 1988, IEEE Trans. Automat. Contr., 1989, 29(1):71-109.
[14]Zames G. Functional analysis applied to nonlinear feedback systems [J].IEEE Trans. On Circuit Theory, 1963, 10: 392-404.